Salyan Greenhouse Project In 8 Ha

Asphalt works (base course, final layer) – 42 000 m2
Earth works (excavation levelling compaction transportation ect.) – 300 000 m3
Water channel – 4 000 meter
Plastic pipework – 58 000 meter